Ground Broken for New Jersey Charter School

Friends of BelovED Community Charter School 2, Inc. (Friends 2) and the project team of Urbahn Architects and construction manager Hollister Construction Services have broken ground for the new BelovED Community Charter School’s Middle School building. The new school will be situated on a half-acre parcel of land in Jersey City, N.J. New Jersey Community Capital and Provident Bank have provided construction financing of $12.5 million for the project.

BelovED Charter School

BelovED Community Charter School (“BelovED”) is named in honor of Martin Luther King, Jr.’s vision of the “Beloved Community.” The school currently serves 960 students.

The building’s façade will feature Exterior Insulation and Finish System (EIFS), a non-load bearing, exterior wall cladding on steel studs, with Batt insulation. Energy efficiency will be also improved by thermally- proficient low emissivity (low-e) windows with high visible transmittance (VT) properties that will allow increased amounts of natural light into the school’s interiors.

The construction team will address several logistical and technical challenges, including working on a small site with almost full lot coverage by the building and elevated playground, which prevents storage of materials on site. Hollister will carefully pre-plan and schedule deliveries of all materials to be trucked in as needed for immediate installation. In addition, the crews will work in close proximity to existing townhouses. In order to eliminate any impact on the neighboring properties, construction workers will pre-auger all piles, removing the need for prolonged, vibration-inducing pile driving.

Featured

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • DLR Group Hires Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that Senior Associate Megan Todd will serve as its new Higher Education Business Development Leader, according to a news release. Her responsibilities will include building the firm’s reach and client relationships in the California higher education sector, based out of San Diego.

Digital Edition