How Rubber Flooring Impacts Costs

From classrooms to hallways, steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With pressure to lower operational expenses, many institutions are turning to lifecycle cost analysis (LCCA) to determine which flooring material offers the greatest durability and resilience over the lifetime of the product, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why.

Installation. The cost of installation (including labor and materials) varies greatly between flooring products. Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times, reducing your timeline by up to half.

Durability. The dense surface of rubber flooring can withstand the pressure of heavy loads, dragging desks and chairs, and is resistant to liquid spills and harsh chemicals. This level of ultra-durability is able to support a facility for decades.

Maintenance. Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.

Sustainability. Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps institutions lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the College Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • USC Launches Major AI Initiative After $200M Gift

    The University of Southern California in Los Angeles, Calif., recently announced that it has launched a “transformational” new AI initiative thanks to a $200M gift, according to a news release. The project will leverage AI toward breakthroughs and innovations in subjects like the health sciences, business, security, and the arts.