Massachusetts District Prepares for New High School

The new Stoughton High School in Stoughton, Mass. is on track for its targeted completion date of the 2019-2020 school year, officials confirmed recently. The new high school facility is in the final phases of steel beam construction, and will begin the process of both slabbing fireproofing in the coming weeks.

The new facility will include a three-story academic wing, and a two-story public wing, which will house the gymnasium and auditorium.  The new Stoughton High is being built alongside the old school, which will be demolished upon its completion.

San Benito High School

Drummey Rosane Anderson, Inc is handling all facets of design for the project, with Consigli Construction Management overseeing construction elements.

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.