University of Colorado Boulder Aerospace Engineering Building Nears Completion

The University of Colorado Boulder (CU) is celebrating the final stages of construction for the new Aerospace Engineering Building on their Boulder, CO, campus. The final steel beam was recently installed on the project, which broke ground in October of 2017.

The Aerospace Engineering Building is designed to serve as a place to build partnerships between CU engineering students and the aerospace industry, both within Colorado and nationally. The new facility will feature labs and collaborative learning spaces for advanced aerospace research.

University of Colorado Aerospace Engineering Building

Hord Coplan Macht is the designer for the project, with Whiting Turner acting as the construction management firm. The new building is slated for completion in July of 2019.

Featured

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.