Using VRF Systems to Solve HVAC Challenges

Variable refrigerant flow (VRF) is a leading edge, globally proven HVAC technology that can help solve many HVAC challenges faced by educational facilities:

Increasing Energy Efficiency
VRF systems with inverter-driven compressors can reduce energy bills up to 25 percent.

Lower Lifecycle Costs
VRF’s installation and operational costs are often lower than those of traditional systems. Standard controls and simpler installation save on materials and labor.

Delivering Fresh Air
With advanced filters, zoning capabilities, and integration with ventilation systems, VRF can help meet indoor air mandates.

Limiting Operational Noise
VRF eliminates disruption indoors and out. Indoor units operate as quietly as 27 decibels and outdoor units are quieter than traditional systems.

Varying Loads Needs
Full-range variable capacity delivers only the amount of conditioning required to match a zone’s cooling or heating demand. Using integrated controls and sensors that measure conditions within each zone, the compressor adjusts speeds to maintain the desired zone temperature.

Solving Comfort Issues
VRF’s zoning offers personalized comfort control, including the ability to simultaneously cool and heat from one heat recovery system.

Controlling Multiple Spaces
VRF can integrate with third-party software. Beyond that, VRF offers a wide variety of controls options, from individual zone controllers to centralized controllers that monitor, schedule, and control multiple indoor units through a web browser.

Minimizing Maintenance
Limited maintenance is necessary and doesn’t require a specialized service contractor.

This article originally appeared in the College Planning & Management September 2018 issue of Spaces4Learning.

About the Author

James DeBerry is commercial marketing manager for Mitsubishi Electric Cooling & Heating (MitsubishiPro.com). He can be reached at jdeberry@hvac.mea.com or 888-979-9686.

Featured

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • College of the Desert Starts Construction on New Campus Location

    College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.