Connecticut High School Opens in Time for the New School Year

Harding High School BridgeportThe new Harding High School in Bridgeport, Conn., recently wrapped up construction in time for the 2018 school year. The new facility replaces an older high school building that had been in use since 1925. The new school features computer labs, new science labs, and a student health center.

Totaling 207,000 square feet, the new high school will serve roughly 1,150 students in the Bridgeport area. Aside from academic and social spaces, the new facility will also feature a day care center. The new Harding High School opened with the start of the school year in late August 2018.

Featured

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.