Simulation Lab Opens at Yale School of Nursing

The Yale School of Nursing is celebrating the opening of its new Simulation Lab and classroom expansion in West Haven, CT, with facilities designed by architecture, art and advisory firm Svigals + Partners. The $5 million project, led by Svigals + Partners with construction manager Shawmut Design and Construction, has transformed more than 8,000 square feet of space in less than one year, readied in time for the fall semester’s start.

Yale Nursing

The teaching center design integrates two new classrooms with a primary care assessment lab as well as six standardized patient examination rooms. It also offers a one-bedroom apartment layout, used for home-care simulation. Additional upgrades went toward improving the Center for Biobehavioral Health Research and a café on the first floor of the Yale building.

The new, state-of-the-art teaching spaces are designed to "help prepare future Yale nurses to address where health care is going, such as outpatient, disaster, and telehealth care,” says Ann Kurth, dean of the Yale School of Nursing. 

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.