Ribbon Cutting Held at Colchester Middle School

A ceremonial ribbon cutting was held at the William J. Johnston Middle School in Colchester, Ct., on Aug. 24 to celebrate the opening of the school’s new administrative and classroom wing.

Colchester Middle School

O&G Industries, the construction manager for the project, was responsible for overseeing the construction of the 70,000-square-foot addition, which includes the new main entrance, administrative offices, cafeteria, media center, multipurpose room/black box theater, and over more than classrooms. Site improvements related to the addition include a new courtyard and patio with expanded parking and redesigned bus and pick up loops that will optimize traffic flow.

Phase 2 of the project includes a 29,000-square-foot renovation of the school’s west wing, which includes a gym, kitchen, cafe, choral, and band rooms. The project will be fully completed in the winter of 2019.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition