Dedication Ceremony Held for New HISD Energy Institute High School

On September 19th, Houston ISD and VLK Architects celebrated the dedication of the new Energy Institute High School. The ceremony was held at the new campus on Southmore Boulevard in the heart of Houston’s Third Ward where students, staff, administration, and community members gathered for a unique board cutting ceremony.

Houston ISD

The new school is home to Houston ISD’s magnet program, specializing in project-based learning centered on the energy industry. This new campus, established in the “Energy Capital of the World,” is helping the district pave the way for industry ready students well versed in corporate culture. The school spans 116,000 square feet and has capacity for 813 students in grades 9-12. Comprised of three buildings that converge at a covered outdoor learning courtyard, the campus design is reflective of industry culture that supports collaborative learning. Each building is comprised with educational environments for individualized focused learning, flexible collaboration, and hands-on CTE lab experiences. 

“Our partnership with everyone at VLK was so genuinely successful because of their ability to advocate for our teachers and our students every step of the way,” said Energy Institute Principal, Lori Lambropoulos. For more information, visit www.vlkarchitects.com.

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.