Things to Know About Wall Protection

Wall protection is a necessity in busy environments to preserve the look of a building and reduce continuous maintenance and repair costs. Here are three things to keep in mind when choosing wall protection.

1. Location.
Deciding on the placement of wall protection can be a challenge. Common areas, like gymnasiums and cafeterias, are prone to wall damage from moving furniture and equipment and may be good starting points. Knowing where damaging objects may regularly hit a wall can help determine where the protection should be placed.

2. Levels of impact.
Wall protection products should be chosen based on the amount of impact the wall may encounter. These products include feature rails, crash rails, rigid sheet, and more. Feature rails can withstand lighter impact from objects such as chairs. Crash rails and corner guards are thicker and designed to keep items further from the wall while withstanding more frequent, intense impacts. Rigid sheet wall protection provides significantly more protection from damage than Type II commercial wall covering. Wall panels are an even more durable option for protection from heavier impacts, as they are considerably thicker. Utilizing wall protection will reduce maintenance and labor costs like drywall repairs and repainting.

3. Special conditions and applications.
Curves and radiuses play a large role in architecture. Graphic wall protection can be used around a column to create unique design elements, such as the imitation of a marble column in a highend space. Certain handrails can be specified for wide or tight wall radiuses. They can even be formed at custom angles on a horizontal plane for ramps and transitions, ensuring mobility and stability for those who rely on both.

This article originally appeared in the College Planning & Management October 2018 issue of Spaces4Learning.

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition