North Olmsted City Schools Opens New $90-million Campus

The first school bell at the North Olmsted (Ohio) City Schools' $90 million facilities project—a new grade 6-12 educational, performing arts center and athletic complex—opened in September. The exterior of the building is emphasized by the late 19th-century Georgian Architecture characterized by its proportion, symmetry, and balance. More than half of the 38.5 acres of the property is located in a flood zone which posed challenges for the 315,000-square-foot campus, including creating separate entrances for the middle and high school, performing arts center, and stadium.

North Olmsted City Schools

Middle school students (grades 6-8) are organized in 6 studios, two per grade level. Each studio houses 150 students, and consists of four general classrooms, one science lab, two small-group rooms, teacher prep room with storage, central collaboration area with presentation platform and adjoining restroom facilities.

The high school (grades 9-12) features labs on the first floor while core classrooms are located on the second floor. Each wing has a defined collaborative area surrounded by classrooms and small-group rooms. Classroom and adjacent spaces are technology-rich with flexible furniture. Transparency of rooms and open hallways provide clear lines of sight enhancing the monitoring and supervision of students.

Designed as a hub rather than a space for lunch, the cafeteria features the school’s orange color and offers high-top tables, moveable furniture, Wi-Fi and charging stations.

The interior color palette, patterns and classical elements such as niches, alcoves and columns provide a sophisticated twist of the 21st-century design flexibility. Color scheme for the middle school is energetic while the high school scheme is calm and sophisticated. Symbolizing the district’s rich history in the arts, an 850-seat performing arts center with oversized proscenium opening evokes a feeling of professional theater. Adjacent to the campus is a new 4,000-seat stadium which features artificial turf football/soccer field and track. Heated lockers rooms, restrooms, and concession stands are located below the stands.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.