Direct-Attach Ceiling Panels Improve Acoustics

Armstrong Tectum Direct-Attach acoustical panels

Armstrong’s Tectum Direct-Attach acoustical panels cut down on excessive reverberation times in Temple University’s School of Architecture.

The acoustics in Temple University’s School of Architecture building in Philadelphia were exhibiting excessively high reverberation times, affecting students’ ability to hear and understand their instructors. Acoustical testing by Metropolitan Acoustics of Philadelphia confirmed that reverberation times were much longer than recommended.

Consultant Graham Everhart explains how his team created models based off the testing to develop solutions. “Our overall recommendation was to incorporate acoustically absorptive materials on the available surfaces,” he states, “and in most spaces, the most available surface was the ceiling, so we focused on that.”

The consultants then worked with NELSON, the architectural firm responsible for the remedial retrofit project. “Considering the amount of hard surfaces, from an open metal deck to drywall walls to concrete floors, it was easy to see why sound bounced around so quickly,” notes Scott Winger, AIA, technical director for NELSON.

To reduce reverberation time and improve speech intelligibility, the design team chose Optima Capz ceiling panels from Armstrong Ceiling Solutions for the lecture halls and other presentation spaces. The panels were installed directly to the deck.

Tectum Direct-Attach acoustical panels from Armstrong were chosen for the classrooms and studios. “Tectum and Capz panels perform in a similar manner acoustically, but we went with the Tectum panels here because we thought they were a little more rugged and better suited for these types of spaces,” Winger states. These panels were also installed directly to the deck.

Acoustical testing following installation of the ceiling panels validated the choice of treatments. Reverberation time dropped an average of 56 percent in the eight spaces that were tested, including a 79 percent drop in one of the classrooms and a 64 percent drop in one of the studios.

www.armstrongceilings.com

This article originally appeared in the College Planning & Management January/February 2019 issue of Spaces4Learning.

Featured

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.