Millikin University Center for Theatre and Dance Under Construction

Construction is underway on the campus of Millikin University in Decatur, IL, on its new Center for Theatre and Dance, with plans to open the building in fall 2020. The $29 million project will feature a 260-seat flexible theatre which includes an orchestra pit, balcony, and tech gallery with a tension wire grid. The new building will also feature lighting and sound labs, a costume studio, a costume classroom, collaboration spaces, and offices and support facilities for current staff and room for growth.

Millikin University Center for Theatre and Dance

The new building will house theatre support spaces as well as several production spaces for Millikin students to use. The center will allow faculty, staff, and students to collaborate more easily. Millikin's new Center for Theatre and Dance will also incorporate four acting studios, two dance studios, two design classrooms and practice rooms, as well as all new modern theatre equipment and LED lights.

Millikin's School of Theatre and Dance is a nationally recognized program, offering conservatory-style training rooted in a liberal arts education.

The architectural partner of the project is the Decatur, IL, firm BLDD.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.