BBVSD Opens New LEED-Designed Transportation Center

On January 25, the Boulder Valley School District (BVSD) (Colo.) celebrated the opening of its new Transportation Center, the first of three major projects to support educational opportunities in the 31,000-student district, with a ribbon-cutting ceremony. The $15.3-million transportation facility is the result of a master planning effort that started in 2015.

BVSD Transportation Center

Located on a nine-acre site in eastern Boulder, the 40,000-square-foot Transportation Center is designed to follow LEED design principals by the Denver-based Stantec team. It provides 28,000 square feet of maintenance programming with 12 repair bays, one chassis wash, parts storage, locker rooms, and multiple offices and meeting spaces for staff. Approximately 11,000 square feet of space is set aside for transportation programming, including a drivers’ break room, lockers, restrooms, and administrative offices.

Additionally, the facility has a covered fueling island; a propane fueling island; four electric vehicle (EV) charging stations and separate infrastructure for electric-powered bus charging when the district adds EV buses; a 2,000-square-foot wash building; and parking for 150 yellow buses, 25 white buses, and 140 employees.

“This facility is a significant upgrade over the previous maintenance facility and creates an environment where employees can function to the best of their abilities,” says Barry Newton, Stantec senior project architect. “This is a purpose-built facility designed specifically for the needs of the school district’s fleet maintenance in the Boulder community—the office areas even have a great view of the Flatirons. The repair bays feature large overhead doors that can be opened on most days and windows to provide daylighting for employees.”

As a sustainably-designed project, the Transportation Center features a reclaimed water system that will be utilized for the bus wash equipment, integration of a bioswale within the stormwater system, water reduction through low-flow fixtures, and motion-activated interior and exterior LED lighting.

Additionally, all the interior surfaces in the facility are painted white to reduce the building’s light loads. The new facility also features radiant in-floor heating and a high-efficiency HVAC system. All HVAC equipment is within the building, providing ease of maintenance and increased longevity.

The Transportation Center is the first of three phases of upgrades for the school district’s central support campus. Construction on a new Central Kitchen is scheduled to start this month, with completion scheduled for January 2020, and a major renovation of the Education Center is currently in design. Stantec is providing master planning, architecture, interior design, landscape architecture, and lighting design services on all three projects.

These projects are part of Boulder Valley School District’s 2014 bond-funded renovation program, made possible thanks to the generous support of local taxpayers. The construction program will provide much needed repairs and improvements to all schools in the district in addition to the work at the central campus.

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.