Leadership Center Project at Dunn School Scheduled to Open Late 2019

Earlier this year, Allen Construction began work on a new 6,121-square-foot, state-of-the-art, leadership center at Dunn School in Los Olivos, Calif. Once completed, the Cindy Bronfman Leadership Center will be a multi-purpose facility that serves as the hub of whole-student education and leadership at Dunn School.

DUNN School

The new center will feature:

  • Flexible spaces for modern teaching and learning
  • An Innovation Lab for student collaboration
  • The Earwig Café, a student-run snack bar that teaches business and entrepreneurship
  • New College Counseling Center
  • Large Alumni Hall for all-school meetings and presentations
  • Student loft for quiet study and retreat
  • Outdoor balcony with a view of the Santa Ynez Mountains
  • Generous shaded spaces outdoors for reflection and relaxation

The building is designed based on a “first principles” approach by taking full advantage of natural phenomena to achieve energy efficiency. The building will have three large wind chimneys to capture and funnel hot air out the top of the building. The floors will be exposed concrete, which will help cool the building naturally during warmer months, and large bay doors can be opened to allow the Valley breezes to cool the building even further.

“We are excited to be part of this great project for Dunn School,” said Eric Johnson, Regional Director for Allen Construction. “The building’s design falls in line with our philosophy of green building and sustainability.”

The facility is expected to be completed by late 2019. For updates on the project, please visit dunnschool.org.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition