VLK Architects and Royse City ISD Break Ground on Bobby Summers Middle School

On March 7, VLK Architects joined with Royse City ISD students, staff, administrators, and community members to celebrate breaking ground on the district’s new Bobby Summers Middle School.  The school’s namesake was also in attendance to commemorate this new campus. This facility is the largest project included in the district’s 2018 bond and will serve 1,200 middle school students in grades six through eight.

Royse City

“Through VLK|LAUNCH, a committee was formed to design this school that consisted of staff, parents, community members, and most importantly our students. The design is going to be safe, smart, modern, and efficient,” said Kevin Worthy, Superintendent, Royse City ISD. “From the secure interior courtyard, to the community friendly extracurricular facilities, we hope that it will spark creativity and passion for learning in every child.”

The new building is designed to promote outdoor engagement with a centrally located secure courtyard and large windows allowing day light throughout. The multipurpose courtyard area located just outside of the cafeteria functions as a staging area and will further serve as a meeting space for large events, classes, and play space. Multipurpose furniture will be placed on tracks that can be moved based on the space needed. The design is specified to be environmentally friendly by using a rainwater collection tank to further aid in landscaping.

Bobby Summers Middle School is expected to open its doors to students in August 2020.

Featured

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.