New Student Services Building for the University of Miami

Although final plans are still being developed, a three-story, 30,000-square-foot facility on the campus of the University of Miami in Florida will be home to a new “one-stop” center for student-facing service departments, the Camner Center for Academic Resources and the Counseling Center. The current Counseling Center building will be demolished to make room for an improved entryway to the new Student Housing Village and Pavia Parking Garage.

University of Miami Student Services

The second floor of the building will house the Camner Center for Academic Resources, which will relocate from its present location. With its core focus on supporting students academically and working directly with faculty, the new space will allow for expanded and enhanced programming and will afford the center the opportunity to serve more students with a variety of customized academic services.

Designed for growth in both staff and programing, the third floor of the building will be reserved exclusively for the Counseling Center. In this new space, the center will be able to host workshops and group sessions, provide training to doctoral students through its American Psychosocial Association accredited training program, and offer other services.

The university has partnered with CIVICA Architecture to design the building, and the total project is estimated to cost $15 million. By including various technical and passive design elements aimed at addressing the climatic challenges of buildings in South Florida’s tropical environment, the project is expected to obtain LEED Silver certification.

Construction is expected to begin in May 2019.

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.