Stonhard Provides Quick, Cost-Effective Flooring for Coppins' Physical Education Complex

Coppin State UniversityCoppin State University is a modern urban learning environment nestled in western Baltimore. Each year thousands of students cultivate their skills and knowledge on the 52-acre campus. The university thrives on the motto “Nurturing Potential… Transforming Lives.”

After several years of planning and construction, Coppin State unveiled its brand new 246,000-square-foot Physical Education Complex. The $136 million facility includes a 4,100- seat basketball arena, a NCAA regulation pool, a fitness center, an auxiliary gymnasium, a dance studio, racquetball courts, and classrooms, as well as many outdoor fields and recreation areas. When plans were drawn up for the design of the basketball arena, polished concrete floors were specified for corridors, lobbies, and locker rooms. However, as work began, project managers were extremely unhappy with the unsatisfactory appearance of the first applications in the locker rooms and put a halt to the entire installation.

Finding themselves in an unexpected situation and drawing from numerous previous positive experiences with Stonhard, the project superintendent reached out to Stonhard’s local territory manager for guidance. Stonhard guaranteed a long-lasting, decorative floor system that could be installed quickly and at a fraction of the cost of the originally specified polished concrete.

Coppin State UniversityStonhard recommended Stonproof ME7 as a crack-bridging agent on the surface of the concrete substrate, followed by Stonhard’s TecTop UF system. The Stonproof ME7 filled all cracks in the floor surface, creating a smooth surface for the next steps in the installation process. TecTop UF creates a seamless, stain-resistant floor surface that is durable and requires little maintenance. A colored epoxy undercoat and a layer of colorful, broadcasted flakes, finished off with a clear urethane sealer, resulted in decorative, eye-catching floors in the complex’s new lobbies, concourses, walkways, restrooms, locker rooms, and pool observation deck. Facility planners and project managers were impressed by Stonhard’s quick and cost-effective remediation of the situation.

Nearly a century in business, Stonhard is the unprecedented world leader in manufacturing and installing high-performance polymer floor, wall, and lining systems. Stonhard maintains 300 product engineers and 200 application crews worldwide who work with you on design specifications, project management, final walk-through, and service after sale. And, Stonhard’s single-source warranty covers both products and installation.

Sponsored by Stonhard

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.