University of Idaho Arena Project Moves to Bid and Construction

MOSCOW, ID – The Idaho State Board of Education (SBOE) has unanimously approved the University of Idaho’s (U of I) request to proceed with the bidding and construction phase of the signature 4,200-capacity Idaho Central Credit Union (ICCU) Arena project. The project will go out for bid and will break ground soon, with building completion expected in the fall of 2021.

University of Idaho Arena

The ICCU Arena will be a showpiece for U of I’s student-athletes, the Vandals, tell the story of Idaho’s heritage, and provide a unique gathering place for generations of Vandals to come. The state-of-the-art arena will provide a teaching facility and the best game atmosphere while also acting as a recruiting showpiece. A practice court will provide attractive and versatile competition space and provide much-needed first-class practice facilities.

The innovative mass-timber construction of the building brought wood industry partners from across the state to the project. These critical partners plan to provide in-kind gifts that may reduce the cost of the building—one that will stand as a stunning example of modern wood construction.

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.