Comprehensive Evaluation of All Roof Components, Structures Recommended Before Making Decision to Reroof

Roof leaks are often a nuisance for a building owner or property manager. Often difficult to track down, leaks can cause damage to interior finishes and lead to tenant complaints—and, if not resolved, unhappy tenants. Those leaks can become a nightmare when a financial decision is made to replace the entire roof of the building... and it still leaks.

“Frequently, an exterior building restoration company, like Western Specialty Contractors, will get a call to come out and try to resolve the leaks. The conversation usually starts with an explanation that this is a brand new roof, that it has had issues from day one, and that the roofer has been out numerous times to satisfy the warranty to no avail. The roofer now says that the problem is not the roof, but something else. That news may be hard for a building owner to accept—after all, it was probably a significant financial investment— but most of the time the roofer is right,” said Thom Belgeri, department manager of Western Specialty Contractors’ St. Louis Roofing Division.

Most structures today are constructed out of many different materials that move at different rates. Marrying all of these components together is complex and, at the same time, can make the roof more vulnerable to errors and failure when reroofing.

“In roofing, details around penetrations at the parapet walls and around building systems are very critical to successful projects,” said Belgeri. “Those are points where the majority of leaks occur. However, in a reroofing project, even if all the details are done correctly, it may not be enough. Often the materials located above those details has aged and weathered as well, leading to deterioration and allowing moisture through. That moisture then finds its way behind the newly installed roof.”

Belgeri says it is important to review the condition of the building’s components that rise above the roof level such as a penthouse, elevator shafts, stair towers, parapet walls and coping and to evaluate the parapet walls from both the interior and exterior. The most visible signs of potential avenues for water infiltration are broken/missing masonry, deteriorated mortar and sealant joints, deteriorated concrete, etc. Sometimes moisture can penetrate even what looks to be a solid wall, but may be porous. If those signs exist, there is most likely a leak.

When such repairs need to be performed, it is extremely important that the new roof is well protected and the original installer is notified, Belgeri said. If the reroofing project is just in the budgeting phase, it is important to evaluate those building components and make the repairs prior to installation of a new roof. It is not only the

This article originally appeared in the School Planning & Management April/May 2019 issue of Spaces4Learning.

About the Author

Thom Belgeri can be reached at www.westernspecialtycontractors.com.

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition