IUPUI to Construct New Classroom Building

INDIANAPOLIS, IN – Indiana University–Purdue University Indianapolis (IUPUI) will soon begin construction on its newest building, the Multidisciplinary Research and Classroom Building (MRCB). The Indiana University Board of Trustees approved the architectural design for the building, to be located at the eastern edge of campus, in October 2018.

IUPUI classroom building

The MRCB is an adaptable facility that will meet evolving teaching and research needs for programs in the School of Science, the School of Engineering and Technology, and the School of Informatics and Computing. It will include a state-of-the-art interdisciplinary research and lab space, a cleanroom environment, a makerspace, and modernized classrooms and collaborative learning spaces.

The first floor will be home to three major classrooms, as well as an informal student lounge and seating area. The classrooms include a 215-seat tiered lecture hall, an 81-seat active learning space with movable chairs and tables, and a 125-seat active learning space where the faculty member is in the middle. Shaped like a football, that space has two tiers of seats that swivel to encourage collaboration. The second and third floors will contain engineering and science labs, as well as more classrooms.

Construction is expected to finish in August 2020.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.