University of Pennsylvania Reveals Plans for New Facility

PHILADELPHIA, PA – The University of Pennsylvania (Penn) has released architectural renderings of the design for the transformative Tangen Hall. The new building will be Penn’s first dedicated space for cross-campus student entrepreneurship and innovation activity.

University of Pennsylvania Tangen Hall

Developed by the Hankin Group, KSS Architects’ design for Tangen Hall sets up each floor with a destination program. A façade of precast concrete and shades of green glass will offer a transparent view into the innovation culture at Penn. The project uses sustainable materials and is designed to meet Penn’s LEED Silver target.

Supporting student entrepreneurship and innovation, the seven-story, 68,000-square-foot building will be one of the largest hubs of its kind on any college campus. It will include incubator spaces and maker spaces to pilot student-led ventures, a test kitchen for food-centric startups, and the master’s level Integrated Product Design Program jointly operated by Wharton, the School of Engineering and Applied Science, and the Stuart Weitzman School of Design. Tangen Hall will also be home to the new Venture Lab, where students from across Penn’s 12 schools can turn good ideas into great outcomes.

Construction of Tangen Hall is slated to begin in spring 2019 and be completed by fall 2020.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.