$36M Athletics Complex Underway at Orange Coast College

COSTA MESA, CA – Groundbreaking recently took place on the $36 million Orange Coast College (OCC) Kinesiology and Athletics Complex in Costa Mesa, CA. The three-building, 88,000-square-foot complex is one part of a broader project to revitalize and modernize OCC’s campus.

Orange Coast College

Rendering courtesy of Little Diversified Architectural Consulting

Construction for the complex, by C. W. Driver, will occur in two phases. The first phase includes new construction of a multi-building, one-story complex spanning 58,000 square feet. Phase II will focus on the renovation of the existing 30,000-square-foot building that houses the men’s and women’s locker rooms and existing pool areas.

Upon delivery, the complex will feature division offices, athletic training, adaptive physical education, equipment management, locker rooms/showers, support spaces for the aquatics programs, a 65-meter competition pool with double bulkheads, a 25-meter instructional pool, and a 450-person bleacher space covered by a canopy. The buildings will be interconnected by an overhead shade structure.

Project partners include Little Diversified Architectural Consulting.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.