$36M Athletics Complex Underway at Orange Coast College

COSTA MESA, CA – Groundbreaking recently took place on the $36 million Orange Coast College (OCC) Kinesiology and Athletics Complex in Costa Mesa, CA. The three-building, 88,000-square-foot complex is one part of a broader project to revitalize and modernize OCC’s campus.

Orange Coast College

Rendering courtesy of Little Diversified Architectural Consulting

Construction for the complex, by C. W. Driver, will occur in two phases. The first phase includes new construction of a multi-building, one-story complex spanning 58,000 square feet. Phase II will focus on the renovation of the existing 30,000-square-foot building that houses the men’s and women’s locker rooms and existing pool areas.

Upon delivery, the complex will feature division offices, athletic training, adaptive physical education, equipment management, locker rooms/showers, support spaces for the aquatics programs, a 65-meter competition pool with double bulkheads, a 25-meter instructional pool, and a 450-person bleacher space covered by a canopy. The buildings will be interconnected by an overhead shade structure.

Project partners include Little Diversified Architectural Consulting.

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.