Town of Leicester to Assess Middle School and Existing Public School Buildings

Finegold Alexander Architects proudly announces they have been selected by the Town of Leicester, Mass. and the Massachusetts School Building Authority as the Architects for the Feasibility and Schematic Design phases of the Leister Middle School project.

“We are thrilled to be working with Finegold Alexander to help build the new Middle School,” said Marilyn Tenzca, superintendent, Leicester Public Schools. “They understand our community and we are excited about the process which will help us educate students for the future.”

Leicester Middle School was originally constructed in 1961 as the Leicester High School. The building is a single-story structure of approximately 74,000 square feet. The location of the existing building is part of a 43-acre campus that is shared with the Leicester Primary School and the Leicester High School.

The building was converted to the Leicester Middle School in 1994, upon the opening of the new high school. The town is seeking to address the educational program limitations and the facility deficits of the current middle school, but also to evaluate the project in context of the overall School District needs and vision.

The Feasibility Study kicked-off with an existing building and site conditions assessment in parallel with a series of Educational Visioning Workshops with the district, including representatives from the school administration, faculty, staff, parents and students. “The visioning session helped to identify and understand the aspirations of the school and the community. It also uncovers key community issues and concerns related to the project,” said Regan Shields Ives, principal, Finegold Alexander Architects.

“The feasibility study will evaluate options for renovations, expansion, or creation of a new building as well as potential grade configurations ranging from a 6-8, 5-8 or pK-8 school.

“At the conclusion of the Feasibility Study, a preferred schematic design option will be presented to the MSBA for a vote to move forward into the Schematic Design phase.

More information is availalble at www.faainc.com.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition