After Evacuation

In the case of an emergency requiring evacuation of a facility, another important aspect to include in emergency plans is where occupants should go and gather in order to determine that everyone has safely left the building. To ensure the fastest, most accurate accountability of building occupants, consider including these steps in your emergency action plan:

  • Designate assembly areas or areas, both inside and outside of the building, where people should gather after evacuating. Assembly locations within the building are often referred to as “areas of refuge.” Make sure your assembly area has sufficient space to accommodate everyone. Exterior assembly areas, used when the building must be partially or completely evacuated, are typically located in parking lots or other open areas.
  • Take a head count after the evacuation. Identify the names and last known locations of anyone not accounted for and pass them to the officials in charge. Accounting for all building occupants following an evacuation is critical. Confusion in the assembly areas can lead to delays in rescuing anyone trapped in the building or unnecessary search-and-rescue operations.
  • Establish a method for accounting for individuals who may not be residents of the facility.
  • Establish procedures for further evacuation in case the incident expands. This may consist of sending people off campus by normal means or providing them with transportation to an offsite location.

This article originally appeared in the College Planning & Management June 2019 issue of Spaces4Learning.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.