After Evacuation

In the case of an emergency requiring evacuation of a facility, another important aspect to include in emergency plans is where occupants should go and gather in order to determine that everyone has safely left the building. To ensure the fastest, most accurate accountability of building occupants, consider including these steps in your emergency action plan:

  • Designate assembly areas or areas, both inside and outside of the building, where people should gather after evacuating. Assembly locations within the building are often referred to as “areas of refuge.” Make sure your assembly area has sufficient space to accommodate everyone. Exterior assembly areas, used when the building must be partially or completely evacuated, are typically located in parking lots or other open areas.
  • Take a head count after the evacuation. Identify the names and last known locations of anyone not accounted for and pass them to the officials in charge. Accounting for all building occupants following an evacuation is critical. Confusion in the assembly areas can lead to delays in rescuing anyone trapped in the building or unnecessary search-and-rescue operations.
  • Establish a method for accounting for individuals who may not be residents of the facility.
  • Establish procedures for further evacuation in case the incident expands. This may consist of sending people off campus by normal means or providing them with transportation to an offsite location.

This article originally appeared in the College Planning & Management June 2019 issue of Spaces4Learning.

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.