Texas A&M AgriLife Unveils Plans For A Robotic Greenhouse Facility

COLLEGE STATION, TX – Texas A&M University’s Texas A&M AgriLife unveiled plans in May for a multi-million-dollar Automated Precision Phenotyping Greenhouse that will utilize advanced sensor technology to enhance agricultural crops in the areas of crop health, yield, nutrition, temperature, drought stress, and other environmental conditions.

Texas Agrilife Greenhouse

The project, expected for completion by summer 2020, is being led by AgriLife Research and the College of Agriculture and Life Sciences. Both AgriLife Research scientists and faculty will use the facility for experimental trials as well as a teaching platform for undergraduate and graduate students.

Two 2,400-square-foot greenhouses for physicists, biochemists, and engineers will work alongside a 3,813-square-foot headhouse with field scientists working in soil, plant, microbe, insect, and other disciplines.

The facility is funded by the Chancellor’s Research Initiative Award and matched by the Governor’s University Research Initiative Award. Additional robotic equipment is funded by a Research Development Fund Award. The facility has a construction budget estimated at $3.5 million.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.