$6M Hillsboro (Ohio) High School Auditorium to Open Fall 2020

Hillsboro City Schools has contracted with Woolpert to provide full design services for its $6-million high school auditorium. The new auditorium will be 23,000 square feet, seat 800, and include flexible space for changing rooms and/or locker rooms.

Hillsboro High School, located about 60 miles east of Cincinnati, has an enrollment of approximately 750 students. Woolpert Project Manager Todd Ford, a 2002 Hillsboro graduate, said the design of the auditorium will mesh with the existing school and include technology and amenities specific to the school’s needs.

“There will be a 40-inch-high stage, which creates optimal viewing from all seats, LED lighting and acoustical design to ensure those on stage are properly seen and heard by the crowd,” Ford said. “Hillsboro will be one of the few schools in the area that can hold its entire school population in its auditorium, and we want to ensure they are served appropriately and effectively.”

The main entrance for the auditorium will be through the high school building, which Ford said will support safety and security for students and staff. The parking lot will be reconfigured to allow for this school expansion but retain the same amount of parking spaces.

Woolpert has performed a facility master plan, and Ford has performed multiple design projects at the high school. Ford said Woolpert’s acquisition of Waller, Todd & Sadler Architects in January has deepened and broadened Woolpert’s educational design capabilities.

“Waller, Todd & Sadler’s experience with K-12 and higher education facilities is nationally known and highly respected,” Ford said. “They know the ins and outs of high school auditoriums from ideal row breaks to ADA requirements to subsurface drainage to the pros and cons of orchestra pits. Their expertise is invaluable and will be well utilized for this and future projects.”

The Hillsboro High School auditorium project is in the design phase and is expected to go out to bid in August. Construction is scheduled to begin this fall, and the auditorium is projected to make its debut in the fall of 2020.

For more information, visit woolpert.com.

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • University of Rhode Island, Gilbane Partner for Three New Residence Halls

    The University of Rhode Island in Kingston, R.I., recently announced a public-private partnership with construction development firm Gilbane, according to a news release. Gilbane will soon start construction on three new residence halls with a total of 1,100 beds: two with apartment-style suites in northwest campus, and a reconstruction of the Graduate Village Apartments for graduate students.

Digital Edition