Tackle High Dusting With a Vacuum

People tend to notice the cleanliness of surfaces immediately around them like desks, floors, and shelves. They don’t necessarily look up and consider the cleanliness of light fixtures, windowsills, and overhead air ducts. Janitorial professionals know that dust in high places can end up falling onto surfaces where people work, play, and eat. This particulate may become airborne and is easily inhaled into the lungs.

That’s where high dusting tools really change the conversation. Adding extension wands to a vacuum can add 10 to 12 feet of reach, bringing many surfaces within reach. Unless completely ignored, the traditional approach to cleaning high places is either with a ladder and some sort of dusting tool or the utilization of a scissor lift. High dusting tools allow janitors to vacuum these areas with two feet safely on the ground.

Putting someone on a ladder to clean is a potential health and safety hazard. It is the employer’s responsibility to take every reasonable precaution and train janitors on the proper use of a ladder to ensure they are used correctly, thus reducing the risk of serious injury from a fall. With the right high dusting tools added to a vacuum, this risk is mitigated as anyone can clean with both feet safely on the ground.

There’s so much more to vacuum than just floors—be they carpeted or hard surface. By pairing high dusting tools with a vacuum, it can be safer, easier, and more convenient to clean just about anywhere.

This article originally appeared in the College Planning & Management July/August 2019 issue of Spaces4Learning.

About the Author

Marvin Mauer is the Canadian country manager for ProTeam® (proteam.emerson.com/en-us).

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.