New Dorms Underway at Lehigh University

BETHLEHEM, PA – Bridge West residence hall, a new student living facility under construction on the campus of Lehigh University will, in tandem with the recently renovated University Center, bring new vitality and greater social interaction to the very core of campus.

Lehigh University Bridge West

In total, Bridge West will eventually provide housing for 720 students. Its construction, which will develop in two phases, is a key component of Lehigh’s plan to expand its undergraduate student population by approximately 1,000 students. Phase I of the development, which will house more than 400 undergraduate students and include a café, fitness area, kitchenettes, lounge areas, and conference rooms, is expected to open by fall 2020.

Whiting-Turner, which has a Bethlehem office, is building the project. Sasaki Associates of Watertown, MA, designed the project.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition