University of Denver Breaks Ground for the Burwell Center for Career Achievement

DENVER, CO – In June, the University of Denver (DU) celebrated the groundbreaking of its new Burwell Center for Career Achievement. Designed by  Lake|Flato Architects, along with Denver-based design partner Shears Adkins Rockmore (SA+R), and in collaboration with Landscape Architect Didier Design Studio, the milestone marks an important step toward transforming the campus into a gathering place for the extended DU community.

Burwell Center

Situated at a key nexus between the campus's traditional core and its growing urban edge, the new 23,000-square-foot Burwell Center for Career Achievement will be a campus hub focused on student career development, employer engagement, and alumni activities. A tower stair will serve as a beacon and an executive lounge will provide views to the campus, the adjacent city core, and the nearby Rocky Mountains, connecting visitors to the neighboring landscape. Designed as a LEED Platinum building, the Center is anticipated to use 70 percent less energy than comparable university buildings.

The building and its surrounding site are focused on creating "sticky spaces," areas that encourage users to linger and interact. The ground floor is designed to connect with the surrounding landscape, linking the Center to DU's academic core and its future campus additions. As one moves up through the building, interactions gradually become more intentional and focused. The ground floor encourages serendipitous encounters around the sticky spaces, whereas the upper floors are focused on coaching, interviews, and career advising.

A Fall 2020 opening is planned.

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition