District Solar Deal Includes Learning Wagons

An Indiana district is setting up solar farms that will cover the energy usage for three of its schools. Hamilton Southeastern Schools will be working with Ameresco to implement two solar arrays, with a total of 4,800 panels and the capacity of generating 2.4 million kWh annually. The company said that level of energy production was sufficient to power 294 homes for a year, avoiding 1,687 metric tons of carbon dioxide emissions.

District Solar Deal Includes Learning Wagons

District Solar Deal Includes Learning Wagons

District Solar Deal Includes Learning Wagons


Source: Hamilton Southeastern Schools

The deal also includes two "solar wagons" and programming to help the schools add solar-oriented curriculum into the classroom.

Funding is coming from a combination of four-year bond fees and cost savings expected from the solar arrays. According to local reporting, the investment is expected to be covered in 11 years through cost savings.

"Our partnership with Ameresco has already allowed us to invest in projects that directly benefit our students and create a more sustainable learning environment at our schools," said Superintendent, Allen Bourff, in a statement. According to the district the project, which began in January, has already loosened up sufficient budget to cover construction of a playground at an intermediate school, with the expectation that two more will be built in the future.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.