New Children’s Center Underway at Boston University

BOSTON, MA – Construction is underway on an expanded facility for Boston University (BU) Children’s Center, a full-time early childhood education program for children of BU faculty and students.

Boston University Chidren's Center

An existing, historic 17,000-square-foot house at 10 Lenox Street in Brookline, MA, will be fully renovated and Kaplan Construction will build a new 3,000-square-foot building in the demolished space that will connect to the main facility. The house will undergo a complete rehabilitation with structural updates, new stairs and elevator, new utility services, and all new mechanical, electrical, and plumbing (MEP) systems.

The outdoor area will feature a combination of natural and manufactured play spaces, and several mature trees will be preserved to achieve a backyard-like atmosphere.

Once completed, the Children’s Center will have the necessary space to accommodate separate infant, toddler, pre-K, and preschool classrooms; free play areas; and indoor gross-motor areas. The building is being designed to meet LEED certification and will be ADA accessible. The Center is scheduled to open in Spring 2020.

Featured

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Can AI Help Build Stronger Communities in Student Housing?

    Student housing success is shifting from operational performance to student experience, with belonging now at the center. A recent 2025 report underscores a growing emphasis on student well-being, community, and engagement, signaling that expectations now extend beyond logistics to ensure students feel supported in their living environments. AI is enabling that shift by reducing administrative workload and giving teams more time to focus on meaningful student engagement.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.