New Children’s Center Underway at Boston University

BOSTON, MA – Construction is underway on an expanded facility for Boston University (BU) Children’s Center, a full-time early childhood education program for children of BU faculty and students.

Boston University Chidren's Center

An existing, historic 17,000-square-foot house at 10 Lenox Street in Brookline, MA, will be fully renovated and Kaplan Construction will build a new 3,000-square-foot building in the demolished space that will connect to the main facility. The house will undergo a complete rehabilitation with structural updates, new stairs and elevator, new utility services, and all new mechanical, electrical, and plumbing (MEP) systems.

The outdoor area will feature a combination of natural and manufactured play spaces, and several mature trees will be preserved to achieve a backyard-like atmosphere.

Once completed, the Children’s Center will have the necessary space to accommodate separate infant, toddler, pre-K, and preschool classrooms; free play areas; and indoor gross-motor areas. The building is being designed to meet LEED certification and will be ADA accessible. The Center is scheduled to open in Spring 2020.

Featured

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.