Sussex Tech to Build New School Instead of Spending on High Maintenance Costs

After spending millions of dollars over the years on renovating and repairing a more than half-century old school building, Sussex Technical School District’s school board unanimously voted to build a new Sussex Technical High School in Delaware. After a five-month independent review, consultants ABHA/BSA+A made recommendations for major improvements including:

  • essential security upgrades;
  • improved traffic flow along U.S. 9 and on campus; and
  • improved, upgraded, and flexible space for technical area classrooms to accommodate industry-standard equipment and technologies.

The district considered three options for improvements. The cost of building a new school at $150.5 million was more affordable than the other two options — renovating the oldest sections of the campus while continuing repairs on the newer sections or renovating the entire campus. The plan aims to bolster Sussex County’s career-technical education programs for both high school students and adult learners.

“Sussex County taxpayers trust us to be good stewards of their money, and building a new school saves taxpayers tens of millions of dollars.” said District Superintendent Stephen Guthrie in a press release on the school’s website. “Over the last year, under new leadership, we have put a renewed emphasis on our core career-technical programs to better serve Sussex County,”

The main high school building was built in 1960 with other sections built in 1964, 1970, 1995, 2000 and 2008. Over the last few years, Sussex Tech has spent about $14 million on maintenance and improvements including repairs to roofs, renovations of student career-technical areas, security installations and an HVAC overhaul.

“Those costs will rise as the campus continues to age. Our engineering consultant has concluded that renovation is only a Band-Aid solution – paying good money for what is only a temporary fix,” Guthrie said.

The current school is about 294,000 square feet, including the main building and about 20 outbuildings. The new building would be about 313,000 square feet. The building would have a capacity for 1,600 students to accommodate growing student interest.

Specific plans and designs for the new building and campus layout would be designed after the state approves the project.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.