Pennsylvania SD Adds Bullet-Resistant Glass to New School Plans

The Wilkes-Barre Area School District approved an upgrade to safety measures for a new high school still under construction. The school board voted to add bullet-resistant glass along the building’s perimeter and in the school’s entryway. The glass adds a $460,000 cost to the project and will be installed by Sterling Glass.

"Unfortunately, this — school shootings, and active shootings, shooters — [is] something we have to contend with and deal with, and this is a measure we can take to try to make those kids as safe as possible," Shawn Walker, vice president of the Wilkes-Barre Area School Board, told a local news reporter.

The total budget for the project is $121 million and includes $7 million for contingent expenses. The new school will combine the district’s three high schools into one.

Construction for the new high school began earlier this year and is expected to be completed in 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Fellowes Expands Finish and Wall-Covering Options for Architectural Wall Systems

    Fellowes Architectural Solutions has expanded the materials library for its architectural wall systems with a series of new finishes and wall-covering options intended to provide architects and designers with additional choices for commercial interiors, according to a company news release.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • UCF Modernizes College of Hospitality Management

    The University of Central Florida in Orlando, Fla., recently completed a major renovation effort for the Rosen College of Hospitality Management, according to a news release. The project modernized 77,600 square feet worth of academic classrooms, teaching labs, and collaborative spaces to support both students and faculty.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.