5 Keys to Proactive Locker Room Cleaning

locker room cleaningSmart cleaning isn’t just about removing soils; it’s about controlling the sources. Entryway mats are a great example. When it comes to locker rooms, a proactive approach controls and contains, so spaces across the school don’t suffer by association. Here’s a few proactive locker room cleaning tips:

From Clean to Dirty
It’s tempting to tackle the big stuff first, but locker rooms should be cleaned in a specific order, starting with the least dirty to the most. Organize the order of cleaning to ensure progression never crosses over previously cleaned areas. And just like home, clean high before low — an efficient process never re-soils cleaned surfaces. Since every locker room is different, special attention must be taken to adjust best practice to the shape of the space.

Flex on Those Microbes
Quality locker room cleaning for schools should use EPA-registered, hospital-grade disinfectants to clean all touch points and floors. Look for EPA-registered disinfectants that leave less residue while still providing the superior cleaning you need for grouted tile and other surfaces. Consider electrostatic disinfection to drastically improve sanitation of crevices and other locker room locations that are hard to reach with other tools.

Address Those Smells
Protein-based soils can build up around floor drains, or on other surfaces, contributing to that infamous mashup of smells locker rooms are famous for. Supplement your cleaning cycle with periodic application of enzyme-based chemicals to break down those proteins before they can build up persistent odors.

Test Your Water
If the water used in your locker room is “hard water” that will make some cleaning solutions inappropriate. Higher concentrations of calcium, iron and magnesium can require different solutions to achieve deep cleaning efficiently.

Keep Up with Your Students
Locker rooms are high-traffic areas. If cleaning doesn’t rise to the frequency of use, that unfairly impacts students using the locker room late in the cleaning cycle. It also increases the amount of soil and particle spread from the locker room to other school spaces. Efficiency in locker room cleaning can instead come from careful attention to the schedule and rigorous training.

This article originally appeared in the School Planning & Management September 2019 issue of Spaces4Learning.

About the Author

Gordon Buntrock is the national director of service delivery for education services at ABM. Prior to joining ABM, he was a director of operations for environmental services at Aramark Healthcare. He can be reached at [email protected].

Featured

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • CU-Lock Haven Receives $1.75M Gift for New Entrepreneurship, Media Center

    Commonwealth University-Lock Haven in Lock Haven, Penn., recently received a $1.75-million donation from entrepreneur and alumnus Nicholas Subich ’17, according to a university news release. The funds will go toward establishing the Nicholas Subich Center for Entrepreneurship and Media, a technology-driven hub for innovation and experiential learning.

  • Tomball ISD Opens New Tomball West High School

    Tomball Independent School District in Tomball, Texas, recently celebrated the official opening of Tomball West High School, the district's third comprehensive high school, with a community ribbon-cutting ceremony, according to a district news release.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.