Winter Meets Its Match

rubber flooring

Syracuse’s harsh winter weather has met its match at Syracuse University with the installation of rubber flooring rubber flooring in residential entrance areas, corridors, common spaces, and stairwells.

Syracuse University in New York has its hands full educating 21,000 students each year. With 70 percent of those students living on campus in 22 residence halls, the university’s housing team has a lot to contend with, including comfort, safety, and upkeep.

Two big challenges? The brutal Syracuse winters and the constant, high-volume traffic within dorm buildings. The housing team needed a floor that could stand up to both. They selected nora® by Interface® rubber flooring to cover dorm entrance areas, corridors, common spaces, and stairwells. Over the past seven years, the floor has outperformed expectations. “The versatility of rubber lends itself to many different spaces,” says Robert J. Spagnoletti, manager of maintenance, “and it performs in all of them, functionally and aesthetically.”

The floor’s easy maintenance regimen played a key role in the selection of rubber—no wax or coating necessary. “That was a main driving factor,” says Spagnoletti. “We found a good product that we don’t have to wax and strip.” Since installation, the floor has delivered on performance—the Syracuse maintenance team’s toughest obstacle.

“Our biggest challenge is the winters and dealing with the snow and salt, keeping the salt down outside, but minimizing the trailing effect inside,” Spagnoletti shares. The nora rubber flooring has performed so efficiently that the maintenance team is using spare tiles as walk-off pads for elevators during the winter.

“We’re getting strong support from all of our directors. They see the areas where nora has been installed and are happy with how it’s worked,” Spagnoletti says.

www.interface.com

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.