Winter Meets Its Match

rubber flooring

Syracuse’s harsh winter weather has met its match at Syracuse University with the installation of rubber flooring rubber flooring in residential entrance areas, corridors, common spaces, and stairwells.

Syracuse University in New York has its hands full educating 21,000 students each year. With 70 percent of those students living on campus in 22 residence halls, the university’s housing team has a lot to contend with, including comfort, safety, and upkeep.

Two big challenges? The brutal Syracuse winters and the constant, high-volume traffic within dorm buildings. The housing team needed a floor that could stand up to both. They selected nora® by Interface® rubber flooring to cover dorm entrance areas, corridors, common spaces, and stairwells. Over the past seven years, the floor has outperformed expectations. “The versatility of rubber lends itself to many different spaces,” says Robert J. Spagnoletti, manager of maintenance, “and it performs in all of them, functionally and aesthetically.”

The floor’s easy maintenance regimen played a key role in the selection of rubber—no wax or coating necessary. “That was a main driving factor,” says Spagnoletti. “We found a good product that we don’t have to wax and strip.” Since installation, the floor has delivered on performance—the Syracuse maintenance team’s toughest obstacle.

“Our biggest challenge is the winters and dealing with the snow and salt, keeping the salt down outside, but minimizing the trailing effect inside,” Spagnoletti shares. The nora rubber flooring has performed so efficiently that the maintenance team is using spare tiles as walk-off pads for elevators during the winter.

“We’re getting strong support from all of our directors. They see the areas where nora has been installed and are happy with how it’s worked,” Spagnoletti says.

www.interface.com

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.