Wentworth Institute of Technology: Center for Engineering, Innovation, and Sciences

Wentworth Institute of Technology 

PHOTOS © ALBERT VECERKA / ESTO

The advancement of technologies for fabrication and the increased interest of educators of hands-on learning environments has prompted a proliferation of makerspaces in college and universities nationwide. The new 75,000-square-foot Center for Engineering, Innovation, and Sciences at Wentworth Institute of Technology in Boston, designed by Leers Weinzapfel Associates, comprises a dynamic, multidisciplinary environment for such collaboration among students of biology, civil engineering, mechanical engineering, and two of the Institute’s newest programs, biomedical and biological engineering.

Open to the quad on one side, a city street on another, and the campus circulation spine on a third, the building’s fully glazed first floor was designed to advertise the activity inside and entice students to participate in the creativity they see from outside. The public lobby is a gathering venue that can be transformed from a collection of informal furniture to a lecture space and a building-long display that exhibits student work. Vertical bifold glass doors on the quad allow public visibility as well as an easy flow from inside to outside to allow work to be moved into and out of the building. The Center’s academic makerspace is on the other side of the lobby, facing the city street.

The goal for the interior of these spaces was to be as flexible as possible in order to adapt to student needs. Tables can be flipped and nested, chairs can be stacked, whiteboards can be brought in and out, and modular, stackable wooden boxes can become stools, benches, and sitting steps. Proximity to tools for fabrication was also a design priority, and they are easily accessible in an adjacent room. Two dedicated project rooms also line one wall, and even these can be opened up to become a larger project space in this new breakthrough facility.

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.