Englewood STEM High School Debuts After Four School Closures

Englewood STEM High School in Chicago is open this week after the district closed down four high schools due to lack of academic achievement and under enrollment of students. Over the past decade the schools — Hope, Harper, TEAM and Robeson — experienced a 70%-85% declines in student enrollment, reported the Chicago Tribune.

The $85 million neighborhood school is brightly lit, with lots of windows and features colorful murals and inspirational words on the walls that integrates STEM symbols with traditional West African art patterns.

The new three-story building was built on the grounds of the former Robeson campus which closed in 2018. More than 400 students are registered to start the school year and nearly all students are African American. In addition, 88% of students are low-income and 22% are “diverse learners,” meaning they have different learning needs.

The $85 million neighborhood school is brightly lit, with lots of windows and features colorful murals and inspirational words on the walls that integrates STEM symbols with traditional West African art patterns.  

“One of the things that we were really adamant about was the power of images, and how images play in how people see themselves,” Principal Conrad Timbers-Ausar told the Chicago Sun-Times. “There’s some images that we wanted to have as students and families come to the school that they can see themselves doing different things throughout the building.”

Englewood STEM, which is the first new school to be built since the 1970s in the neighborhood, has an on-site health clinic on the first floor that’s open to students, staff and the community. Chicago Public Schools calls the classrooms in the high school as “world-class multipurpose educational spaces” where students will focus on science, technology, engineering and math. The gym/auditorium seats about 800 and the grounds feature an athletic facility with a baseball diamond and football field.

The school’s mascot is the panthers, which was chosen by community vote and inspired by the blockbuster film “Black Panther.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.