Madison SD Installs Electronic Door Locks, Internet-Based Phones to Enhance Safety

Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.

The $6.5 million security plan was partially funded by a grant program the Wisconsin state government established last year in a response to a mass shooting at a Florida High school. Madison was awarded $1 million in the first round of funding and $1.5 million in the second round. The rest of the plan was covered by local funds.

More than 4,600 locks have been swapped out across the district. The electronic locks — which are controlled by staff ID badges — automatically locks people from coming in a room once the door is closed, unless they have a badge.

About 4,100 new phones have been put in all schools but the software that increases the phone’s capabilities will be installed throughout the fall semester. Once added, the phones will be able to page an individual classroom through the PA system and send out emergency notifications to families.

“This new phone system gives us a ton of flexibility and functionality because it is run over the internet,” director of building services, Chad Wiese told a local newspaper.

In addition, the school district is adding more than 400 cameras and window-hardening film to main entrances of schools, designed to slow down active shooters.

In order to receive the grant funding from the state, teachers needed to complete associated safety training. The district also trained staff and teachers on new standardized emergency response procedures.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.