Madison SD Installs Electronic Door Locks, Internet-Based Phones to Enhance Safety

Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.

The $6.5 million security plan was partially funded by a grant program the Wisconsin state government established last year in a response to a mass shooting at a Florida High school. Madison was awarded $1 million in the first round of funding and $1.5 million in the second round. The rest of the plan was covered by local funds.

More than 4,600 locks have been swapped out across the district. The electronic locks — which are controlled by staff ID badges — automatically locks people from coming in a room once the door is closed, unless they have a badge.

About 4,100 new phones have been put in all schools but the software that increases the phone’s capabilities will be installed throughout the fall semester. Once added, the phones will be able to page an individual classroom through the PA system and send out emergency notifications to families.

“This new phone system gives us a ton of flexibility and functionality because it is run over the internet,” director of building services, Chad Wiese told a local newspaper.

In addition, the school district is adding more than 400 cameras and window-hardening film to main entrances of schools, designed to slow down active shooters.

In order to receive the grant funding from the state, teachers needed to complete associated safety training. The district also trained staff and teachers on new standardized emergency response procedures.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.