Net-Zero Middle School to Be Built Outside of Houston

A new middle school, just outside of Houston, will have a net zero design, meaning the building will produce as much energy as it consumes. Corgan, the architecture firm that designed the school, presented the latest schematics at a Fort Bend ISD school board meeting on Sept. 16.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs. The energy produced by the solar panels will be converted on-site and sent to the power company who will give the school credit for the power it produces, reported Community Impact Newspaper.  

“We are going to achieve net zero by using renewable energy resources and an enhanced building envelope that will reduce the heating and cooling load on this building,” said AJ Sustaita, an education architecture project manager at Corgan.

The 2018 FBISD bond election included funds for the new middle school. The school district approved Corgan to prepare design and construction documents for the school in December. The proposed project budget is more than $10 million.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at ymarquez@1105media.com.

Featured

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • Cedar Crest College to Build Criminal Justice Facility

    Cedar Crest College recently announced it will create a new Expert Witness Training Center and Crime Scene Lab for its campus in Allentown, Pa., according to a news release. The college is one of eight in the country to have earned Forensic Science Educational Programs Accreditation Commission (FEPAC) accreditation for its undergraduate and graduate programs.

  • Studio G Announces Completion of New Massachusetts Elementary School

    The Groton-Dunstable Regional School District in Groton, Mass., recently announced the completion of a new elementary school, according to a news release. Florence Roche Elementary School measures in at 110,000 square feet and has the capacity for 645 students in grades K–4.