State-of-the-Art Health Sciences Building Underway at Assumption College

WORCESTER, MA – Construction has begun on a new 41,000-square-foot Health Sciences Building at Assumption College. A groundbreaking was held on May 10 and construction will be completed for the fall 2020 semester. The facility was designed by Nault Architects, Lauring Construction is serving as general contractor on the project.

Assumption College Health Sciences Building

The Health Sciences building will house the nursing and physician assistant studies programs set to open in fall 2020, but will benefit students in all disciplines. The nursing floor will feature a large nursing skills lab with seven full-sized hospital beds for teaching patient care. Four simulation labs will have hi-fidelity manikins which can simulate actual patient conditions (vitals, seizures, cardiac arrest, childbirth, etc.) ,all of which can be controlled remotely by a simulation lab technician.

Throughout the spacious building with an interior illuminated by natural light, students will have access to lounges, smaller break-out space and de-briefing rooms and conference rooms, nine offices for faculty and staff, and suites for each of the deans.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition