$43.3M Temecula Valley Campus Underway for Mt. San Jacinto College

TEMECULA, CA – Construction on Mt. San Jacinto College’s (MSJC) new $43.3-million, 350,000-square-foot Temecula Valley Campus is underway by C.W. Driver Companies. Consisting of a seismic retrofit and tenant improvement of an existing five-story office building, the new campus will allow MSJC to expand access to residents of Southwest Riverside County and the surrounding communities. The improvements also will address current shortages in classroom space across the district.

Temecula Valley Campus

Previously owned by Abbott Laboratories, the building was purchased by MSJC with Measure AA facilities bond funds, which were approved to fund improvements to existing facilities and purchase new ones to accommodate increasing student enrollment as the region grows. Each of the building’s 175,000-square-foot towers will be converted from office space into classrooms, laboratories, and offices to serve students who are obtaining associates degrees, career certificates, and the necessary courses needed to transfer to four-year universities. The fifth floor will be entirely comprised of lab space, and upgrades will also be made to include a kitchen, fitness center, and lounges for students and faculty to enjoy.

The 27-acre campus is of similar size to MSJC’s Menifee Valley location, which currently serves more than 15,000 students. The first phase of construction, including all seismic retrofits and the full build-out of three floors, is expected to complete in time for the fall 2020 semester. The second phase will complete by summer 2021.

MSJC, part of California’s 115-community college system, is a comprehensive college serving a 1,700-square-mile area from the San Gorgonio Pass to Temecula. This campus is part of the district’s five-year plan, which also includes projects at the San Jacinto, Menifee Valley, and San Gorgonio Pass campuses.

Featured

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • College of the Desert Starts Construction on New Campus Location

    College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.