$43.3M Temecula Valley Campus Underway for Mt. San Jacinto College

TEMECULA, CA – Construction on Mt. San Jacinto College’s (MSJC) new $43.3-million, 350,000-square-foot Temecula Valley Campus is underway by C.W. Driver Companies. Consisting of a seismic retrofit and tenant improvement of an existing five-story office building, the new campus will allow MSJC to expand access to residents of Southwest Riverside County and the surrounding communities. The improvements also will address current shortages in classroom space across the district.

Temecula Valley Campus

Previously owned by Abbott Laboratories, the building was purchased by MSJC with Measure AA facilities bond funds, which were approved to fund improvements to existing facilities and purchase new ones to accommodate increasing student enrollment as the region grows. Each of the building’s 175,000-square-foot towers will be converted from office space into classrooms, laboratories, and offices to serve students who are obtaining associates degrees, career certificates, and the necessary courses needed to transfer to four-year universities. The fifth floor will be entirely comprised of lab space, and upgrades will also be made to include a kitchen, fitness center, and lounges for students and faculty to enjoy.

The 27-acre campus is of similar size to MSJC’s Menifee Valley location, which currently serves more than 15,000 students. The first phase of construction, including all seismic retrofits and the full build-out of three floors, is expected to complete in time for the fall 2020 semester. The second phase will complete by summer 2021.

MSJC, part of California’s 115-community college system, is a comprehensive college serving a 1,700-square-mile area from the San Gorgonio Pass to Temecula. This campus is part of the district’s five-year plan, which also includes projects at the San Jacinto, Menifee Valley, and San Gorgonio Pass campuses.

Featured

  • Nonprofit Launches Center to Boost Data-Driven Student Success Strategies

    National nonprofit Complete College America (CCA) recently launched the Center for Leadership, Institutional Metrics, and Best Practices (CLIMB), according to a news release. CLIMB’s ultimate purpose is to help higher-education institutions use data-driven strategies to improve student outcomes by providing tools, frameworks, and support.

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.