$43.3M Temecula Valley Campus Underway for Mt. San Jacinto College

TEMECULA, CA – Construction on Mt. San Jacinto College’s (MSJC) new $43.3-million, 350,000-square-foot Temecula Valley Campus is underway by C.W. Driver Companies. Consisting of a seismic retrofit and tenant improvement of an existing five-story office building, the new campus will allow MSJC to expand access to residents of Southwest Riverside County and the surrounding communities. The improvements also will address current shortages in classroom space across the district.

Temecula Valley Campus

Previously owned by Abbott Laboratories, the building was purchased by MSJC with Measure AA facilities bond funds, which were approved to fund improvements to existing facilities and purchase new ones to accommodate increasing student enrollment as the region grows. Each of the building’s 175,000-square-foot towers will be converted from office space into classrooms, laboratories, and offices to serve students who are obtaining associates degrees, career certificates, and the necessary courses needed to transfer to four-year universities. The fifth floor will be entirely comprised of lab space, and upgrades will also be made to include a kitchen, fitness center, and lounges for students and faculty to enjoy.

The 27-acre campus is of similar size to MSJC’s Menifee Valley location, which currently serves more than 15,000 students. The first phase of construction, including all seismic retrofits and the full build-out of three floors, is expected to complete in time for the fall 2020 semester. The second phase will complete by summer 2021.

MSJC, part of California’s 115-community college system, is a comprehensive college serving a 1,700-square-mile area from the San Gorgonio Pass to Temecula. This campus is part of the district’s five-year plan, which also includes projects at the San Jacinto, Menifee Valley, and San Gorgonio Pass campuses.

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition