King William County Public Schools Projected to Save Millions in Operating Costs

King William County Public Schools in Virginia selected ABM, a facility services company, to develop a customized solution to upgrade the school district’s infrastructure, as well as outsource its maintenance and custodial services. Through ABM’s Energy Performance Contracting program, the customized solution is projected to save the school district close to $5 million in energy and operating costs over a 15-year period.

The school district hopes to replace old equipment, decrease energy and operations expenses and avoid upfront costs. Through ABM’s program, the district will be able to make facility upgrades without impacting its capital budget.

“ABM is proud to work with King William County Schools to provide a financial solution to address their infrastructure needs,” Scott Giacobbe, ABM’s Chief Revenue Officer, said in a press release. “We will help the school district uncover significant energy and operational savings that can be used to positively impact their students’ learning environment.”

Highlights of the project include:

  • Switching to energy-efficient LED lighting and replacing HVAC units, including 56 rooftop units at King William High School;
  • Installing building automation controls to remotely monitor and address maintenance needs;
  • Replacing the roof at King William High School;
  • Installing cold plasma ionization systems to clean air contaminants at King William High School and Acquinton Elementary School;
  • Upgrading transformers at several facilities;
  • Installing water conservation measures at King William High School; and
  • Sealing building envelopes to improve ventilation and outside air intake systems at several facilities.

In addition, ABM will provide daily maintenances and custodial services for each school in the district. The upgrades are projected to save more than $173,000 in energy and operating costs in the first year. The project will conclude in 2020.

 

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • New Campus Stadiums Evolve Beyond Sports into Community Assets

    New campus planning documents reveal an abundance of high interest in new stadiums, or renovations and repurposing projects for existing facilities. Many universities, in fact, are developing campus complexes with new stadiums as a draw for retail, hotels, and student housing. Multipurpose facilities with high-end features are being designed to attract large sports events of various types, concerts, and other university functions.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

Digital Edition