Santa Maria-Bonita Elementary Celebrates Construction Milestone

Santa Maria-Bonita School District celebrated a major construction milestone of its newest elementary school on Sept. 26. The California school district celebrated the project’s topping out by signing the final beam before it was lifted and installed at the top of the structure.

The two-story, $51 million school was designed by DLR Group and constructed by AMG & Associates. When completed in August 2020, it’s expected to accommodate up to 900 students in transitional kindergarten through sixth grade.

The 66,000 square-foot campus will feature 26 classrooms, a space for students enrolled in the district’s Therapeutic Learning Program, administrative offices, a multipurpose cafeteria/auditorium and play-fields.

"This is a unique design," Superintendent Luke Ontiveros told a local news station. "It really is built around 21st century skills, collaboration, communication, creativity. There's some learning areas outside of the traditional classrooms that we'll be able to maximize and take advantage. Besides the two-story design, it's really that programmatic piece that we'll be able to implement that really is going to make a difference in the futures of our children."

 The 66,000 square-foot campus will feature 26 classrooms, a space for students enrolled in the district’s Therapeutic Learning Program, administrative offices, a multipurpose cafeteria/auditorium and play-fields.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.