Wall Heaters

Blustery days with chilling winds can cause heating problems in many facilities with high volumes of foot traffic. While the main rooms within the building may be warm from the primary heating source, many areas are left out in the cold as drafts bring the temperatures down. Vestibules, lobbies, entrance ways, and hallways can see a steady flow of people moving in and out throughout the day, opening doors and letting in chilly air.

In addition to open doors, cold air manages to find its way into facilities by any means necessary—whether it’s through vents, cracks, crevices or unsealed windows. To counteract these cold drafts, facilities should consider fan-forced wall heaters that provide continuous comfort through optimized airflow. Gentle heating sources are often not powerful enough to provide sufficient warmth in drafty areas. Fan-forced wall heaters however, push back on the infiltrating cold air, ensuring occupants feel the warmth as soon as they enter the building and until the moment they leave. These heating units can stop the drafts before they spread throughout a building, bringing down temperatures and reducing overall heating efficiency.

Fan-forced wall heaters with an automatic delay eliminate cold drafts on start-up and discharge residual heat from the heater body during shut down. This helps attack drafts at their source while making the best use of available heat. In addition, consider fan-forced wall heaters that come with an integrated thermostat allowing for easy adjustment of room temperature to maintain a desired comfort level.

As with any heating unit, it is imperative to select high-quality products that offer protection against common safety risks. In terms of general design, fan-forced wall heaters come with a clear, easily accessible power on/off switch for added safety during maintenance.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

About the Author

Andrew Martin is a product manager at Marley Engineered Products (www.marleymep.com), based in Bennettsville, SC.

Featured

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Can AI Help Build Stronger Communities in Student Housing?

    Student housing success is shifting from operational performance to student experience, with belonging now at the center. A recent 2025 report underscores a growing emphasis on student well-being, community, and engagement, signaling that expectations now extend beyond logistics to ensure students feel supported in their living environments. AI is enabling that shift by reducing administrative workload and giving teams more time to focus on meaningful student engagement.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • AAADM Announces Building Safety Month Initiatives

    The American Association of Automatic Door Manufacturers (AAADM) recently announced its support of Building Safety Month as declared by the International Code Council (ICC), according to a news release.